Sea Water unit has been delivered, lifted and placed in its destination place.
Task was consisting of structural analysis and check of unit structural steel cage.
Analysis of lifting procedure as well as possible scenarios during transportation, lifting and placing procedures.
Structural analysis and design of lifting pad eyes and check of steel frame.